A separate product for software teams

GovBridge Assurance for teams that build tax and finance software

You update your software. Something that used to work quietly stops working. Assurance helps your team spot it before your customers do.

Looking to check companies for your clients? That is the main GovBridge service: see how it works.

Sound familiar?

  • “We shipped an update and a due date disappeared from the screen.”

    Write down what should always be there. Assurance checks it before and after every change.

  • “It worked last week. Nobody can say what changed.”

    Upload each run and compare it with the last one. Checks that used to pass and now fail are listed first.

  • “HMRC's test service was down. Did our checks pass or not?”

    Neither. A check that could not finish is marked blocked. It is never quietly counted as a pass.

How it works, in plain English

  1. You decide what should be true. For example: “the response includes a due date”.
  2. Your developer runs the checks on your own machine or build server, before and after a change. Credentials stay with you, and taxpayer traffic does not pass through GovBridge.
  3. You upload the report. It holds results, times and versions, not raw responses or passwords.
  4. GovBridge shows each check as passed, failed or blocked, and what changed since the last comparable run.
Passed
The result you expected was there.
Failed
It was missing or different.
Blocked
The check could not finish, for example because a test service was unavailable. Blocked is not a pass.

A simple example

A due date disappears after a software update.

  1. Your developer adds a check that a due date is present.
  2. They run it before and after the update, then upload both reports.
  3. GovBridge shows the check that passed before and fails now, so your team can investigate.

It checks what your team specifies. It does not fix the software automatically or prove that a tax return is correct.

Why software teams use it

Failures stay visible

Failed and blocked checks are kept separate. Compare runs with the same template, suite version and environment to see which outcomes changed. Your team still decides whether to release.

It runs on your side

Use the generic HTTP contract template against your own staging service, or the VAT obligations template against HMRC's sandbox. The runner executes your configuration locally.

Evidence with a clear scope

Reports record outcomes, timestamps and suite versions without raw payloads or credentials. A SHA-256 digest confirms the exported file matches what was stored; it does not verify the claims inside it.

Built on the same gateway

The Companies House, HMRC sandbox and public-data tools remain available. Production access depends on each agency's credentials, terms and approval process. Gateway API reference.

What Assurance is not

  • Not a certificate. It does not certify that your software is correct, secure, compliant or ready to launch.
  • Not HMRC approval or recognition. Production access and approvals are a separate process with each agency. Assurance does not grant them.
  • Not independent testing. Reports are supplied by your team. GovBridge does not witness the tests being run.
  • A pass is narrow. It means one specific expected result was present in that run. Your team still decides whether a release is ready.
  • A preview. Free to use, on a best-efforts basis, with no uptime guarantee. Reports belong to the signed-in account; shared team access is not available.

Want help with one difficult connection? See the free preview and scoped pilots.

Setup guide

Your first release report.

Run two local checks. Upload the reports. See what changed.

Requires Node.js 22+ · Email sign-in for uploads · No API key needed in the browser

1 Run the demo

Extract the download. From the directory containing the assurance folder, run:

node assurance/cli.mjs run --demo healthy --output healthy.json
node assurance/cli.mjs run --demo regression --output regression.json

Runs locally, without calling government services. The regression changes a field and intentionally fails (exit code 1). Both reports are labelled simulation.

2 Upload and compare

  1. Sign in by email and create an HTTP contract project in Assurance.
  2. Upload healthy.json, then regression.json.
  3. Open the latest run to see changes. Choose All checks to include passes.

Upload sanitised reports only. Keep secrets and personal data out of report names, versions and messages.

When you're ready for more

Open only the instructions you need.

Check your own integrationStaging routes and assertions

Edit assurance/examples/http-contract.json to describe your staging routes, expected statuses and JSON assertions. The example checks /health and /obligations; adapt these to your service.

Set CUSTOMER_API_URL and CUSTOMER_API_TOKEN through your shell or CI secret store. Remove the header binding if the target does not require authentication.

node assurance/cli.mjs run --config assurance/examples/http-contract.json --output assurance-report.json

HTTPS is required for remote targets. HTTP is supported only on loopback. Redirects are not followed. Write methods require explicit opt-in in your configuration; only use authorised test systems with synthetic data. Government production hosts are excluded by the runner's destination policy.

Checks are numbered in configuration order. The runner fingerprints the configuration so changed test definitions do not silently compare as the same suite. Changing an environment variable does not change the fingerprint: use a separate project for each target integration.

Connect the HMRC sandboxVAT obligations prerequisites

The HMRC VAT obligations template performs read-only checks directly against HMRC's sandbox. Create a project with this matching template. You need a subscribed sandbox application and a VAT-enrolled test user with an authorised access token.

Set HMRC_ACCESS_TOKEN, HMRC_TEST_VRN, HMRC_FROM_DATE, HMRC_TO_DATE and HMRC_TEST_SCENARIO. The documented example uses QUARTERLY_NONE_MET.

node assurance/cli.mjs run --config assurance/examples/hmrc-vat-obligations.json --output vat-report.json

These responses may be canned. This template tests the documented response contract; it does not prove persistence, tax calculations, your customer's implementation or production readiness. Use the HTTP contract template for your own integration.

HMRC VAT API documentation · Understanding sandbox behaviour

Automate release checksCI commands and uploads

Run the same command in CI. It returns 0 for passed checks, 1 for failed assertions and 2 for a blocked run or configuration error. Preserve the report as a CI artifact even when the run fails.

For automated CLI uploads, get your API key from the dashboard after signing in. Set GOVBRIDGE_URL to your API origin and GOVBRIDGE_API_KEY in your CI secret store. Copy the project ID from the workspace, then run:

node assurance/cli.mjs upload --project YOUR-PROJECT-UUID --report assurance-report.json

Uploading does not change a failed test into a pass. Preserve the run command's exit status as your release gate. The downloaded README includes a CI example. Uploading the same report again is idempotent; changing evidence under the same run ID is rejected.

Understand reports and limitsResults, retention and evidence
OutcomeMeaning
PassedThe configured assertions were satisfied in this run.
FailedA response did not meet the expected contract.
BlockedA prerequisite, connection or dependency prevented a check from completing.

Failed checks take precedence over blocked checks in the overall status. Comparisons use the previous imported report in the same project, environment and suite version. They follow upload order, which may differ from execution order.

The workspace stores client-reported evidence, not independently witnessed test execution. It rejects raw payload fields and common credential patterns. Do not put secrets, taxpayer identifiers or personal data in names, versions or messages.

Download the evidence and compare its SHA-256 checksum with the digest shown on the run. The digest covers the exact server-exported JSON bytes, which may differ in formatting from the local file. It proves stored-byte integrity, not the truth of the reported checks.

Projects belong to your API-key identity. Rotating that key preserves your projects; deleting a project removes all its runs. The preview allows 20 projects, 200 runs per project and 1,000 runs per account. Export evidence before deleting anything you need to retain.

What do the technical terms mean?A short glossary
API
A way for one software system to request information from another.
Sandbox
A provider's test environment, separate from live business activity.
Staging
Your team's test version of its own system.
JSON